• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Track Blocking.
Figure 9. Track Shoe.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  608    609    610    611    612  613  614    615    616    617    618  
img
.
TM 5-2410-240-23-2
0112
REMOVAL CONTINUED
5. Remove bolt (Figure 8, Item 2), washer (Figure 8, Item 3), and plate (Figure 8, Item 1) from machine.
6. Rotate valve (Figure 8, Item 4) counterclockwise to allow grease to escape. Close valve when track tension is
fully released.
Figure 8. Track Tension.
0112
0112-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.