Figure 11. Master Link Installation.
Figure 14. Track Blocking.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  613    614    615    616    617  618  619    620    621    622    623  
img
.
TM 5-2410-240-23-2
0112
INSTALLATION CONTINUED
10. Lubricate four bolts (Figure 12, Item 1) with oil.
11. Install track shoe (Figure 12, Item 2) and four bolts (Figure 12, Item 1) on master link. Tighten bolts to 221 lb-ft
(300 Nm). Tighten bolts an additional 120 degrees.
Figure 12. Track Shoe.
0112
12. Remove suitable blocking (Figure 13, Item 2) from between track (Figure 13, Item 1) and track frame
(Figure 13, Item 3).
13. Perform track adjustment shown in this work package.
Figure 13. Track Support.
0112
0112-13