• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 24. Heater Hoses.
Figure 27. Cable Clamps.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  784    785    786    787    788  789  790    791    792    793    794  
img
.
TM 5-2410-240-23-2
0133
INSTALLATION CONTINUED
N OT E
Install clamps and spacers as noted during removal.
26. Install clamp (Figure 25, Item 8), washer (Figure 25, Item 9), and bolt (Figure 25, Item 10), on harness
(Figure 25, Item 7).
27. Install two spacers (Figure 25, Item 3), three clamps (Figure 25, Item 6), washer (Figure 25, Item 4), and bolt
(Figure 25, Item 5), on harness (Figure 25, Item 11).
N OT E
Mark and tag all electrical connections to aid installation.
28. Connect two engine harness connectors (Figure 25, Item 16) and new tiedown strap (Figure 25, Item 15) on
platform harnesses (Figure 25, Item 14).
29. Install spring washer (Figure 25, Item 1) and nut (Figure 25, Item 2) on harness (Figure 25, Item 11).
30. Connect platform harness (Figure 25, Item 12) on engine harness (Figure 25, Item 11) and twist lock
(Figure 25, Item 13) on harness.
Figure 25. Electrical Harness.
0133
0133-23


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.