• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 25. Electrical Harness.
Figure 28. Positive Cable.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  785    786    787    788    789  790  791    792    793    794    795  
img
.
TM 5-2410-240-23-2
0133
INSTALLATION CONTINUED
31. Lubricate new O-ring (Figure 26, Item 9) and new O-ring (Figure 26, Item 7) with refrigerant oil.
32. Install new O-ring (Figure 26, Item 9) on A/C line (Figure 26, Item 8).
33. Install A/C hose (Figure 26, Item 10) and tube nut (Figure 26, Item 11) on A/C line (Figure 26, Item 8).
34. Install new O-ring (Figure 26, Item 7) on fitting (Figure 26, Item 5).
35. Install A/C hose (Figure 26, Item 4) and fitting (Figure 26, Item 5) on accumulator (Figure 26, Item 6).
36. Install bracket (Figure 26, Item 3), washer (Figure 26, Item 2), and bolt (Figure 26, Item 1) on engine
(Figure 26, Item 12).
Figure 26. A/C Lines.
0133
37. Install clamp (Figure 27, Item 2) on cable (Figure 27, Item 3).
38. Install clamp (Figure 27, Item 2), washer (Figure 27, Item 4), and nut (Figure 27, Item 1) on bracket (Figure 27,
Item 5).
Figure 27. Cable Clamps.
0133
0133-24


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.