• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 29. Starter Cables.
RIGHT HYDROSTATIC DRIVE PISTON PUMP SERVICE (WITH WINCH)

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  788    789    790    791    792  793  794    795    796    797    798  
img
. . . . . . . .
TM 5-2410-240-23-2
0133
FOLLOW-ON TASKS
000133
1. Install right hydrostatic drive piston pump (with Winch) (WP 0134).
2. Install right hydrostatic drive piston pump (with Ripper) (WP 0135).
3. Install transmission control manifold (WP 0130).
4. Install fuel hoses (WP 0174).
5. Install cooling module (WP 0039).
6. Install hood support (WP 0188).
7. Install air inlet, exhaust hoses, and check valve (WP 0041).
8. Install muffler (WP 0045).
9. Install engine speed sensor (WP 0058).
10. Install bottom guards (WP 0156).
11. Fill fuel tank (TM 5-2410-240-10).
12. Evacuate and charge A/C system (WP 0254).
13. Verify correct operation of machine (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE
0133-27/(28 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.