• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 9. Lockout Switch Connector.
Figure 2. Cable Connections at Battery Disconnect Switch.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  857    858    859    860    861  862  863    864    865    866    867  
img
. . .
10
TM 5-2410-240-23-2
0141
FIELD MAINTENANCE
-
BATTERY DISCONNECT SWITCH AND CABLE REPLACEMENT
01
41
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Equipment Conditions
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
Machine parked (TM 5-2410-240-10)
0
(WP 0289, Item 51)
Batteries removed (WP 0142)
0
0
Materials/Parts
Drawings Required
0
0
Rag, wiping (WP 0290, Item 21)
TM 5-2410-240-24P, Figure 66
0
0
Tag, marker (WP 0290, Item 30)
0
Estimated Time to Complete
0
Lockwasher (3)
0
2.0 Hr
0
References
0
WP 0282
0
REMOVAL
000141
N OT E
Tag and mark electrical connectors to aid installation.
1. Position boot (Figure 1, Item 1) aside.
2. Remove nut (Figure 1, Item 5), lockwasher (Figure 1, Item 4), and cable (Figure 1, Item 3) from battery
disconnect switch (Figure 1, Item 2). Discard lockwasher.
Figure 1. Cable Connections at Battery Disconnect Switch.
0141
0141-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.