• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 13. Harness Retainer Underneath Right Side of Cab Floor.
Figure 15. Cable Connection at Junction Block.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  915    916    917    918    919  920  921    922    923    924    925  
img
.
TM 5-2410-240-23-2
0145
INSTALLATION CONTINUED
19. Install spacer (Figure 14, Item 2), large clamp (Figure 14, Item 3), small clamp (Figure 14, Item 6), washer
(Figure 14, Item 1), and bolt (Figure 14, Item 7) from plate (Figure 14, Item 4).
20. Install large clamp (Figure 14, Item 3) on cable conduit (Figure 14, Item 5).
Figure 14. Cable Retainer Underneath Right Side of Cab Floor.
0145
0145-13


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.