• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CROSSOVER TUBES REMOVAL
Figure 2. Tube Clamp.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1081    1082    1083    1084    1085  1086  1087    1088    1089    1090    1091  
img
.
TM 5-2410-240-23-2
0157
CROSSOVER TUBES REMOVAL CONTINUED
Figure 1. Crossover Tubes and Clamps.
0157
END OF TASK
0157-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.