Figure 4. Right Side Panel Insulation Foam.
Figure 1. Wiring Harness Bracket and Support Bracket.

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  550    551    552    553    554  555  556    557    558    559    560  
img
. . . . . . . . . . . .
12
TM 5-2410-240-23-3
0231
FIELD MAINTENANCE
-
OPERATOR PLATFORM REPLACEMENT
023
1
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Tools and Special Tools
References
0
0
Tool Kit, General Mechanic's
WP 0282
0
(WP 0289, Item 51)
0
Equipment Conditions
0
Handle, Ratchet, 3/4" Drive, 17" Long (S0374)
Machine parked (TM 5-2410-240-10)
(WP 0289, Item 53)
0
0
Cab removed (WP 0232)
Handle, Sliding T, 3/4" Drive, 17" Long
0
Fuel tank removed (WP 0175)
(S0375) (WP 0289, Item 53)
0
0
Sling, Nylon (WP 0289, Item 40)
Batteries removed (WP 0142)
0
0
Socket, Impact, 3/4" Drive, 6 Point, 1-13/16"
Washer bottle removed (WP 0223)
0
(S0429) (WP 0289, Item 53)
0
Drawings Required
0
Lifting device (3,000-lb capacity)
0
TM 5-2410-240-24P, Figure 110
0
Materials/Parts
0
Estimated Time to Complete
0
Rag, wiping (WP 0290, Item 21)
0
6.0 Hr
Tiedown strap (WP 0290, Item 31)
0
0
Personnel Required
0
Two
0
0231-1