• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 39. BII Box.
Figure 2. Seat Harness Connectors.

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  617    618    619    620    621  622  623    624    625    626    627  
img
. . . . . . . .
14
TM 5-2410-240-23-3
0236
FIELD MAINTENANCE
-
SEAT WIRING HARNESS REPLACEMENT
0236
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Equipment Conditions
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
Machine parked (TM 5-2410-240-10)
0
(WP 0289, Item 51)
0
Personnel Required
0
Screwdriver Attachment, Torx, 1/4" Drive,
Two
T-27 (S0287) (WP 0289, Item 53)
0
0
Drawings Required
Materials/Parts
0
0
TM 5-2410-240-24P, Figure 111
Rag, wiping (WP 0290, Item 21)
0
0
Tag, marker (WP 0290, Item 30)
Estimated Time to Complete
0
0
Tiedown strap (WP 0290, Item 31)
0
0.5 Hr
0
References
0
WP 0282
0
REMOVAL
000236
N OT E
Tag electrical connectors to aid installation.
Note location and quantity of tiedown straps to aid installation.
1. Remove two tiedown straps (Figure 1, Item 3), and seat and cab harnesses (Figure 1, Items 1 and 2) from clips
(Figure 1, Item 4). Discard tiedown straps.
Figure 1. Seat Harness Clips.
0236
0236-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.