• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 12. Cover and Retaining Hardware on Top of Machine.
A/C HOSE AND BRACKET REPLACEMENT - Continued

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  812    813    814    815    816  817  818    819    820    821    822  
img
.
TM 5-2410-240-23-3
0248
A/C HOSE REMOVAL CONTINUED
000248
C AU T I O N
Cap or plug all A/C hoses and fittings during removal to protect against contamination.
Failure to follow this caution may result in equipment damage.
N OT E
Tag and mark A/C hoses to aid installation.
58. Remove bolt (Figure 13, Item 1), washer (Figure 13, Item 10), and clamp (Figure 13, Item 9) from machine
(Figure 13, Item 2).
59. Remove clamp (Figure 13, Item 9) from A/C hose (Figure 13, Item 3).
N OT E
Note location of tiedown straps to aid installation.
60. Remove two tiedown straps (Figure 13, Item 8) from A/C hoses (Figure 13, Items 3 and 7). Discard tiedown
straps.
61. Loosen two fittings (Figure 13, Item 6) and disconnect A/C hoses (Figure 13, Items 3 and 7) from condenser
(Figure 13, Item 5).
62. Remove two O-rings (Figure 13, Item 4) from A/C hoses (Figure 13, Items 3 and 7). Discard O-rings and
position A/C hoses aside.
Figure 13. A/C Hoses, O-rings and Retaining Hardware on Condenser Assembly.
0248
0248-15


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.