• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Harness, Solenoid, Hoses, and Retaining Hardware on Winch Piston Pump.
Figure 4. Winch Piston Pump and Retaining Hardware.

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  999    1000    1001    1002    1003  1004  1005    1006    1007    1008    1009  
img
.
TM 5-2410-240-23-3
0267
REMOVAL CONTINUED
N OT E
Note location of tiedown sraps to aid installation.
t
Tag and mark electrical connectors to aid installation.
13. Remove tiedown strap (Figure 3, Item 10) from solenoid (Figure 3, Item 8) and harness (Figure 3, Item 9).
Discard tiedown strap.
14. Disconnect harness (Figure 3, Item 9) from solenoid (Figure 3, Item 8).
15. Remove nut (Figure 3, Item 7), O-ring (Figure 3, Item 6), and solenoid (Figure 3, Item 8) from winch piston
pump (Figure 3, Item 15). Discard O-ring.
16. Remove bolt (Figure 3, Item 4), washer (Figure 3, Item 3), clamp (Figure 3, Item 5), and spacer (Figure 3,
Item 2) from right hydrostatic drive piston pump (Figure 3, Item 1).
N OT E
Tag and mark hoses, lines, and fittings to aid installation.
Cap or plug hoses, lines, and fittings.
17. Loosen two tube nuts (Figure 3, Item 11) and disconnect hoses (Figure 3, Item 12) from winch piston pump
(Figure 3, Item 15). Position hoses aside.
18. Loosen three tube nuts (Figure 3, Item 13) and disconnect lines (Figure 3, Item 14) from winch piston pump
(Figure 3, Item 15). Position lines aside.
Figure 3. Harness, Solenoid, Lines, and Hoses on Winch Piston Pump.
0267
0267-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.