Figure 46. Guard and Retaining Hardware.
Figure 48. Guard and Retaining Hardware.

Field Maintenance Manual 1 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  598    599    600    601    602  603  604    605    606    607    608  
img
. . . . .
TM 5-2410-241-23-1
0020
Table 1. Powertrain Troubleshooting Procedures - Continued.
0020
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
N OT E
1402-3 Transmission Sole-
noid Valve #2 Voltage
It may be necessary to remove winch (if equipped) to access transmis-
Above Normal - Contin-
sion solenoid valves.
ued
18. Remove two bolts (Figure 47,
Item 3) and guard (Figure 47,
Item 4) from machine.
19. Remove 15 bolts (Figure 47,
Item 1) and plate (Figure 47,
Item 2) from machine.
Figure 47. Guard, Plate, and Retaining Hardware.
0020
20. Disconnect transmission solenoid
valve #2 connector P-C3 (WP
0018, Figure 72) from transmis-
sion solenoid valve #2 (WP 0145).
21. Using a digital multimeter (WP
1. If continuity is found, replace pow-
0296), test for continuity between
ertrain ECM (WP 0175). Ensure all
pin F on transmission harness
harness connectors are recon-
connector P-C1 (WP 0018,
nected. Verify correct operation of
Figure 56) and pin 1 on transmis-
machine (TM 5-2410-241-10).
sion solenoid valve #2 connector
2. If continuity is NOT found, replace
P-C3 (WP 0018, Figure 72).
transmission sensor harness (WP
0173). Ensure all harness connec-
tors are reconnected. Verify cor-
rect operation of machine (TM 5-
2410-241-10).
0020-172