• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 59. Fuel Shutoff Valve.
Figure 62. Hose.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  55    56    57    58    59  60  61    62    63    64    65  
img
.
TM 5-2410-241-23-2
0057
ENGINE INSTALLATION CONTINUED
N OT E
Remove caps and plugs from all hoses, lines and tubes.
Install all hoses as noted during removal.
45. Install two new O-rings (Figure 61, Item 7) and fitting (Figure 61, Item 8) on pump (Figure 61, Item 9).
46. Install hose (Figure 61, Item 1) and tube nut (Figure 61, Item 2) on fitting (Figure 61, Item 8).
47. Install two new O-rings (Figure 61, Item 6) and fitting (Figure 61, Item 5) on pump (Figure 61, Item 9).
48. Install hose (Figure 61, Item 3) and tube nut (Figure 61, Item 4) on fitting (Figure 61, Item 5).
49. Position spacer (Figure 61, Item 10) and hose (Figure 61, Item 16) on pump (Figure 61, Item 9).
50. Install new O-ring (Figure 61, Item 11), spacer (Figure 61, Item 10), new O-ring (Figure 61, Item 13), hose
(Figure 61, Item 17), split flange clamp (Figure 61, Item 12), four washers (Figure 61, Item 14), and bolts
(Figure 61, Item 15) on pump (Figure 61, Item 9).
Figure 61. Pump Hoses.
0057
0057-60


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.