• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4. Fittings to Elbow.
Figure 6. Hoses to Elbow.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  251    252    253    254    255  256  257    258    259    260    261  
img
.
TM 5-2410-241-23-2
0076
INSTALLATION CONTINUED
9. Install new gasket (Figure 5, Item 2), elbow (Figure 5, Item 4), two washers (Figure 5, Item 3), and bolts (Figure
5, Item 5) on water pump (Figure 5, Item 1).
Figure 5. Water Pump Elbow.
0076
0076-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.