• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Fittings to Elbow.
Figure 5. Water Pump Elbow.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  250    251    252    253    254  255  256    257    258    259    260  
img
.
TM 5-2410-241-23-2
0076
INSTALLATION
00076
N OT E
Note position and orientation of fittings to aid installation.
1. Install new O-ring (Figure 4, Item 8) on fitting (Figure 4, Item 7).
2. Install fitting (Figure 4, Item 7) on water pump elbow (Figure 4, Item 11).
3. Install new O-ring (Figure 4, Item 6) on fitting (Figure 4, Item 5).
4. Install elbow (Figure 4, Item 5) and jam nut (Figure 4, Item 9) on fitting (Figure 4, Item 7).
5. Install new O-ring (Figure 4, Item 4) on fitting (Figure 4, Item 2).
6. Install fitting (Figure 4, Item 2) and jam nut (Figure 4, Item 10) on water pump elbow (Figure 4, Item 11).
7. Install new O-ring (Figure 4, Item 3) on valve (Figure 4, Item 1).
8. Install valve (Figure 4, Item 1) and jam nut (Figure 4, Item 12) on fitting (Figure 4, Item 2).
Figure 4. Fittings to Elbow.
0076
0076-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.