• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Coolant Temperature Sensor O-ring.
Figure 6. Coolant Temperature Sensor.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  245    246    247    248    249  250  251    252    253    254    255  
img
.
TM 5-2410-241-23-2
0075
INSTALLATION
00075
1. Install two new O-rings (Figure 4, Item 7) on pipe (Figure 4, Item 6).
2. Install new gasket (Figure 4, Item 5), pipe (Figure 4, Item 6), two washers (Figure 4, Item 4), and bolts (Figure
4, Item 3) on cooling manifold (Figure 4, Item 1).
3. Install four new gaskets (Figure 4, Item 2) on cooling manifold (Figure 4, Item 1).
Figure 4. Cooling Manifold Gaskets.
0075
4. Install new O-ring (Figure 5, Item 4) on fitting (Figure 5, Item 3).
5. Install new O-ring (Figure 5, Item 2) on fitting (Figure 5, Item 1).
6. Install new O-ring (Figure 5, Item 6) on coolant temperature sensor (Figure 5, Item 5).
Figure 5. Coolant Temperature Sensor O-ring.
0075
0075-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.