TM 5-2410-241-23-2
0102
INSTALLATION CONTINUED
6. Tighten nine bolts in sequence shown (Figure 4).
Figure 4. Bolt Tightening Sequence.
0102
7. Install crankshaft drive gear (Figure 5, Item 2) on idler gears (Figure 5, Item 1).
Figure 5. Crankshaft Drive Gear.
0102
END OF TASK
FOLLOW-ON TASKS
000102
1. Install flywheel (WP 0100).
2. Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE