• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4. Bolt Tightening Sequence.
Figure 1. Bracket and Retaining Hardware on Right Side of Flywheel Housing.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  419    420    421    422    423  424  425    426    427    428    429  
img
. . . .
10
TM 5-2410-241-23-2
0103
FIELD MAINTENANCE
-
FLYWHEEL HOUSING ASSEMBLY REPLACEMENT
0103
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Tools and Special Tools
Personnel Required
0
0
Tool Kit, General Mechanic's
Two
0
(WP 0302, Item 65)
0
References
0
Bracket, Link (1-1/4 in.; 9,000 lb [4,000 kg])
WP 0295
0
(WP 0302, Item 12)
0
Gloves, Rubber (S0208)
Equipment Condition
0
0
(WP 0302, Item 68)
Machine parked (TM 5-2410-241-10)
0
Goggles (S0209) (WP 0302, Item 68)
0
Starter removed (WP 0061)
0
Sling, Multiple Leg (WP 0302, Item 54)
0
Rear gear assembly removed (WP 0085)
0
Stud, Guide, M12 X 1.75
Rear crankshaft seal removed (WP 0102)
0
(WP 0302, Item 59) (2)
0
Rear engine mounts removed (WP 0046)
0
Lifting Device (1,000-lb capacity)
0
Drawing Required
0
Materials/Parts
0
TM 5-2410-241-24P, Figure 43
0
Gasket (Sealing Compound)
(WP 0303, Item 10)
0
Estimated Time to Complete
0
Rag, Wiping (WP 0303, Item 24)
0
38.5 Hr
0
Sealing Compound (WP 0303, Item 29)
0
Gasket
0
O-ring (6)
0
0103-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.