• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Blocks.
Figure 5. Pads.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  588    589    590    591    592  593  594    595    596    597    598  
img
.
TM 5-2410-241-23-2
0125
INSTALLATION
000125
N OT E
Procedure will install right sideequalizer bar pad. Follow the same procedure for left side
equalizer bar pads.
Lifting track on one side allows maximum clearance between frame and equalizer bar on
opposite side.
1. Position left side of track (Figure 4, Item 1) on blocks (Figure 4, Item 2).
Figure 4. Blocks.
0125
0125-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.