TORQUE CONVERTER RELIEF VALVE TEMPERATURE SENSOR REPLACEMENT - Continued
Figure 2. Pads.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  585    586    587    588    589  590  591    592    593    594    595  
img
. .
6
TM 5-2410-241-23-2
0125
FIELD MAINTENANCE
-
EQUALIZER BAR PAD REPLACEMENT
0125
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Equipment Condition
Tools and Special Tools
0
0
Machine parked (TM 5-2410-241-10)
0
Tool Kit, General Mechanic's
(WP 0302, Item 65)
0
Bottom guards removed (WP 0199)
0
Wood Block 12 x 12 x 24
0
Drawing Required
0
Materials/Parts
0
TM 5-2410-241-24P, Figure 57
0
Rag, Wiping (WP 0303, Item 24)
0
Estimated Time to Complete
0
References
0
5.5 Hr
0
WP 0295
0
REMOVAL
000125
N OT E
Procedure will remove right sideequalizer bar pad. Follow same procedure for left side
equalizer bar pads.
Lifting track on one side allows maximumclearance between frame and equalizer bar on
opposite side.
1. Position left side of track (Figure 1, Item 1) on blocks (Figure 1, Item 2).
Figure 1. Blocks.
0125
0125-1