Figure 3. Accumulator Bolts.
Figure 5. Testing with Nitrogen Charging Kit.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  595    596    597    598    599  600  601    602    603    604    605  
img
.
TM 5-2410-241-23-2
0126
TEST
000126
N OT E
The following steps will determine if accumulator is charged to appropriate pressure.
1. Move machine to a smooth horizontal location.
2. Lower all implements (TM 5-2410-241-10).
3. Engage parking brake and shut down engine (TM 5-2410-241-10).
4. Allow machine to sit for two minutes before attaching gauges to allow pressure and temperature to stabilize.
5. Remove two bolts (Figure 4, Item 3) and protective strap (Figure 4, Item 1) from accumulator
(Figure 4, Item 2).
6. Remove protective cap (Figure 4, Item 5) from valve (Figure 4, Item 4) on accumulator (Figure 4, Item 2).
Figure 4. Accumulator Pressure.