FIELD MAINTENANCE INSTRUCTIONS
-
FUSE BOX REPLACEMENT
0176
Removal, Disassembly, Cleaning and Inspection, Assembly, Installation
INITIAL SETUP
References
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
WP 0295
0
(WP 0302, Item 65)
0
Equipment Condition
0
Materials/Parts
Machine parked (TM 5-2410-241-10)
0
0
Rag, Wiping (WP 0303, Item 24)
Batteries removed (WP 0155)
0
0
Tag, Marker (WP 0303, Item 34)
0
Drawing Required
0
Tiedown Strap (WP 0303, Item 36)
0
TM 5-2410-241-24P, Figure 87
Decal
0
0
Locknut (2)
Estimated Time to Complete
0
0
3.5 Hr
0
0176-1