• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Fuse Box Connections.
Figure 3. Main Relay.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1018    1019    1020    1021    1022  1023  1024    1025    1026    1027    1028  
img
.
TM 5-2410-241-23-2
0176
DISASSEMBLY
000176
N OT E
Tag and mark connectors to aid installation.
Note location of straps to aid installation.
1. Remove nut (Figure 2, Item 4) and washer (Figure 2, Item 5) from starter relay (Figure 2, Item 3).
2. Remove nut (Figure 2, Item 7) from main relay (Figure 2, Item 8).
3. Remove nut (Figure 2, Item 1), washer (Figure 2, Item 2), and strap (Figure 2, Item 6) from fuse block
assembly (Figure 2, Item 12).
4. Remove nut (Figure 2, Item 13) and washer (Figure 2, Item 14) from strap (Figure 2, Item 11).
5. Remove nut (Figure 2, Item 9), wire (Figure 2, Item 10), and strap (Figure 2, Item 11) from main relay (Figure 2,
Item 8)
Figure 2. Starter and Main Relay Straps.
0176
0176-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.