Figure 15. Main Relay.
Figure 17. Fuse Box Connections.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1032    1033    1034    1035    1036  1037  1038    1039    1040    1041    1042  
img
.
TM 5-2410-241-23-2
0176
ASSEMBLY CONTINUED
N OT E
Install straps as noted during disassembly.
23. Install strap (Figure 16, Item 11), wire (Figure 16, Item 10) and nut (Figure 16, Item 9), on main relay
(Figure 16, Item 8)
24. Install washer (Figure 16, Item 14) and nut (Figure 16, Item 13) on strap (Figure 16, Item 11).
25. Install strap (Figure 16, Item 6), washer (Figure 16, Item 2) and nut (Figure 16, Item 1) on fuse block assembly
(Figure 16, Item 12).
26. Install nut (Figure 16, Item 7) on main relay (Figure 16, Item 8).
27. Install washer (Figure 16, Item 5) and nut (Figure 16, Item 4) on starter relay (Figure 16, Item 3).
Figure 16. Starter and Main Relay Straps.
0176
END OF TASK
0176-17