TM 5-2410-241-23-2
0189
LOWER HYDRAULIC OIL COOLER LINE INSTALLATION CONTINUED
6. Install lower line (Figure 10, Item 1), three clamps (Figure 10, Item 2), washers (Figure 10, Item 4), and bolts
(Figure 10, Item 3) on machine.
Figure 10. Clamps Under Machine.
0189