• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4. Heater Coil Inspection.
Figure 6. Heater Hose Valves.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  345    346    347    348    349  350  351    352    353    354    355  
img
.
TM 5-2410-241-23-3
0221
INSTALLATION CONTINUED
N OT E
Install hoses as tagged during removal.
2. Install two clamps (Figure 5, Item 1) on two hoses (Figure 5, Item 2).
3. Connect two hoses (Figure 5, Item 2) on heater coil (Figure 5, Item 3), tighten clamps (Figure 5, Item 1).
4. Secure grommet (Figure 5, Item 4) on machine.
Figure 5. Heater Hoses.
0221
0221-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.