Figure 6. Temperature Switch Tube.
HEATER COIL REPLACEMENT

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  340    341    342    343    344  345  346    347    348    349    350  
img
. . .
TM 5-2410-241-23-3
0220
INSTALLATION CONTINUED
10. Install new gasket (Figure 8, Item 4), cover (Figure 8, Item 3), four washers (Figure 8, Item 1), and bolts
(Figure 8, Item 2) on platform (Figure 8, Item 5).
Figure 8. Cover.
0220
11. Evacuate, charge, and leak test the air conditioning system. Refer to A/C System Service (WP 0263).
END OF TASK
FOLLOW-ON TASK
000220
1. Install hood (WP 0200).
2. Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE
0220-7/(8 blank)