• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Cover.
Figure 4. Hose Assembly.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  336    337    338    339    340  341  342    343    344    345    346  
img
.
TM 5-2410-241-23-3
0220
INSTALLATION CONTINUED
3. Remove cab filter (Figure 2, Item 1) from platform (Figure 2, Item 2).
Figure 2. Cab Filter.
0220
C AU T I O N
Use caution when handling temperature switch tube. The tube is made of a soft metal and
is approximately 2 ft long. Do not kink or bend tube. Damage to equipment will result.
4. Remove temperature switch tube (Figure 3, Item 3) from evaporator coil (Figure 3, Item 6) and grommet
(Figure 3, Item 4).
5. Remove four bolts (Figure 3, Item 1), washers (Figure 3, Item 2) and two plates (Figure 3, Item 7) from heater
coil (Figure 3, Item 5) and evaporator coil (Figure 3, Item 6).
Figure 3. Temperature Switch Tube.
0220
0220-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.