• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. A/C Evaporator Inspection.
Figure 8. Cover.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  339    340    341    342    343  344  345    346    347    348    349  
img
.
TM 5-2410-241-23-3
0220
INSTALLATION CONTINUED
7. Install two plates (Figure 6, Item 7), four washers (Figure 6, Item 2) and bolts (Figure 6, Item 1) on heater coil
(Figure 6, Item 5) and evaporator coil (Figure 6, Item 6).
C AU T I O N
Use caution when handling temperature switch tube. The tube is made of a soft metal and
is approximately 2 ft long. Do not kink or bend tube. Damage to equipment will result.
8. Install temperature switch tube (Figure 6, Item 3) through grommet (Figure 6, Item 4) and into evaporator coil
(Figure 6, Item 6).
Figure 6. Temperature Switch Tube.
0220
9. Install cab filter (Figure 7, Item 1) on platform (Figure 7, Item 2).
Figure 7. Cab Filter.
0220
0220-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.