TM 5-2410-241-23-3
0220
INSTALLATION CONTINUED
7. Install two plates (Figure 6, Item 7), four washers (Figure 6, Item 2) and bolts (Figure 6, Item 1) on heater coil
(Figure 6, Item 5) and evaporator coil (Figure 6, Item 6).
C AU T I O N
Use caution when handling temperature switch tube. The tube is made of a soft metal and
is approximately 2 ft long. Do not kink or bend tube. Damage to equipment will result.
8. Install temperature switch tube (Figure 6, Item 3) through grommet (Figure 6, Item 4) and into evaporator coil
(Figure 6, Item 6).
Figure 6. Temperature Switch Tube.
0220
9. Install cab filter (Figure 7, Item 1) on platform (Figure 7, Item 2).
Figure 7. Cab Filter.
0220