TM 5-2410-241-23-3
0221
INSTALLATION CONTINUED
5. Open two heater hose valves (Figure 6, Item 2) on heater hoses (Figure 6, Item 1).
Figure 6. Heater Hose Valves.
0221
END OF TASK
FOLLOW-ON TASK
000221
1. Install air conditioner evaporator coil (WP 0220).
2. Fill cooling system with coolant (WP 0113).
3. Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE