1. Install accumulator (Figure 1, Item 3), two straps (Figure 1, Item 6), two washers (Figure 1, Item 4), and bolts
(Figure 1, Item 5) on machine.
N OT E
Coat new O-rings with clean refrigerant oil before installation.
Install hoses as tagged during removal.
2. Install new O-ring (Figure 1, Item 7) on hose assembly (Figure 1, Item 8). Connect hose assembly on
accumulator (Figure 1, Item 3).
3. Install new O-ring (Figure 1, Item 2) on hose assembly (Figure 1, Item 1). Connect hose assembly on
accumulator (Figure 1, Item 3).
FOLLOW-ON TASKS
000239
1. Charge and leak test the air conditioning system (WP 0263).
2. Install engine enclosure left door guard (WP 0202).
4. Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE