• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4. Evaporator Coil.
Figure 6. Accumulator Hose to Evaporator Coil.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  494    495    496    497    498  499  500    501    502    503    504  
img
.
TM 5-2410-241-23-3
0242
ACCUMULATOR HOSE TO EVAPORATOR COIL INSTALLATION
000242
N OT E
Coat new O-rings with clean refrigerant oil before installation.
Install hoses as tagged during removal.
1. Install hose (Figure 5, Item 8) on machine.
2. Install grommet (Figure 5, Item 9) on hose (Figure 5, Item 8).
3. Install new O-ring (Figure 5, Item 7) on hose (Figure 5, Item 8).
4. Connect hose (Figure 5, Item 8) on evaporator coil (Figure 5, Item 6) and tighten nut (Figure 5, Item 5).
5. Install new gasket (Figure 5, Item 4), cover (Figure 5, Item 3), four washers (Figure 5, Item 1), and bolts
(Figure 5, Item 2) on platform.
Figure 5. Evaporator Coil.
0242
0242-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.