• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Latch Striker.
CAB FLOOD LAMP AND BRACKET SERVICE

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  610    611    612    613    614  615  616    617    618    619    620  
img
.
TM 5-2410-241-23-3
0251
INSTALLATION CONTINUED
11. Install door latch bracket (Figure 7, Item 2), three washers (Figure 7, Item 4), and bolts (Figure 7, Item 3) on
machine.
12. Position door latch (Figure 7, Item 1) down on machine.
Figure 7. Door Latch Bracket.
0251
END OF TASK
FOLLOW-ON TASKS
000251
Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE
0251-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.