• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 14. Light Socket Base.
Figure 16. Upper Half of Instrument Panel.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  720    721    722    723    724  725  726    727    728    729    730  
img
.
TM 5-2410-241-23-3
0262
ASSEMBLY CONTINUED
4. Install two new display decals (Figure 15, Item 11) on instrument panel (Figure 15, Item 8).
5. Install three louvers (Figure 15, Item 18) and six screws (Figure 15, Item 19) on instrument panel (Figure 15,
Item 8).
6. Install gauge (Figure 15, Item 17), four washers (Figure 15, Item 16), and screws (Figure 15, Item 15) on
instrument panel (Figure 15, Item 8).
7. Install switch (Figure 15, Item 13), new lockwasher (Figure 15, Item 12), and nut (Figure 15, Item 14) on
instrument panel (Figure 15, Item 8).
8. Install plate (Figure 15, Item 2), deflector (Figure 15, Item 3), six washers (Figure 15, Item 20), screws
(Figure 15, Item 21) and nuts (Figure 15, Item 1) on instrument panel (Figure 15, Item 8).
9. Install two switches (Figure 15, Item 7) on instrument panel (Figure 15, Item 8).
N OT E
Install spacers as noted during removal.
10. Install two spacers (Figure 15, Item 5), selector switches (Figure 15, Item 4), nuts (Figure 15, Item 6), knobs
(Figure 15, Item 9), and setscrews (Figure 15, Item 10) on instrument panel (Figure 15, Item 8).
Figure 15. Lower Half of Instrument Panel.
0262
0262-14


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.