• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 15. Lower Half of Instrument Panel.
Figure 17. Indicator Bulb.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  721    722    723    724    725  726  727    728    729    730    731  
img
.
TM 5-2410-241-23-3
0262
ASSEMBLY CONTINUED
11. Install gauge (Figure 16, Item 17), four washers (Figure 16, Item 16), and screws (Figure 16, Item 15) on
instrument panel (Figure 16, Item 1).
12. Install gauge (Figure 16, Item 13), four washers (Figure 16, Item 12), and screws (Figure 16, Item 11) on
instrument panel (Figure 16, Item 1).
13. Install ignition switch (Figure 16, Item 10), nut (Figure 16, Item 6), knob (Figure 16, Item 7), new lockwasher
(Figure 16, Item 9), and screw (Figure 16, Item 8) on instrument panel (Figure 16, Item 1).
14. Install two switches (Figure 16, Item 5), new lockwashers (Figure 16, Item 14), and nuts (Figure 16, Item 4) on
instrument panel (Figure 16, Item 1).
15. Install two louvers (Figure 16, Item 2) and four screws (Figure 16, Item 3) on instrument panel (Figure 16,
Item 1).
Figure 16. Upper Half of Instrument Panel.
0262
0262-15


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.