TM 5-2410-240-23-1
0020
Table 2. Powertrain and Chassis Troubleshooting with Codes - Continued.
CID FMI CODE
Test or Inspection
Corrective Action
1482-03 Sensor Power Sup-
21. For D6K Dozer with Winch, dis-
ply (10 VDC) Voltage Above
connect platform harness connec-
Normal - Continued
ure 249).
0283), test for continuity between
No Continuity - Replace platform wir-
pin 45 on platform harness to cab
ing harness (WP 0150, WP 0155).
harness connector PL-C1 (WP
Ensure all harness connectors are
0018, Figure 214) and pin 69 on
reconnected. Verify proper operation
platform harness ECM J1 connec-
of machine (TM 5-2410-240-10).
No Continuity - Proceed to step 24.
0283), test for continuity between
pin 69 on platform harness ECM
harness (WP 0150, WP 0155).
Ensure all harness connectors are
Figure 217) and all other pins on
reconnected. Verify proper operation
platform harness ECM J1 connec-
of machine (TM 5-2410-240-10).
No Continuity - Proceed to step 25.
0283), test for continuity between
pin 69 on platform harness ECM
harness (WP 0150, WP 0155).
Ensure all harness connectors are
Figure 217) and all other pins on
reconnected. Verify proper operation
platform harness ECM J2 connec-
of machine (TM 5-2410-240-10).
No Continuity - For D6K Dozer with
0283), test for continuity between
Winch, proceed to step 26.
pin 69 on platform harness ECM
No Continuity - For D6K Dozer with
Ripper, replace machine ECM (WWP
Figure 217) and all pins on plat-
0147). Ensure all harness connectors
form harness connector PL-C2
are reconnected. Verify proper opera-
tion of machine (TM 5-2410-240-10).
harness (WP 0150, WP 0155).
Ensure all harness connectors are
reconnected. Verify proper operation
of machine (TM 5-2410-240-10).
0283), test for continuity between
No Continuity - Replace platform wir-
pin 69 on platform harness ECM
ing harness (WP 0150, WP 0155).
Ensure all harness connectors are
Figure 217) and pin 9 on platform
reconnected. Verify proper operation
harness connector PL-C33 (WP
of machine (TM 5-2410-240-10).
0020-74