• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 29. Hydraulic Adjustment.
Figure 30. Calibration Menu.

Field Maintenance Manual 1 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1355    1356    1357    1358    1359  1360  1361    1362    1363    1364  
img
. .
TM 5-2410-240-23-1
0031
CALIBRATION
00031
The following calibrations may be performed for components on machine ECM:
Transmission Drive Pump Pressure Override Calibration.
Hystat Pump and Motor Solenoid Calibration.
Operator Control Calibrations (Hystat).
Calibration of a component reporting to machine ECM allows ECM to determine correct output level. Calibration
also allows ECM to determine correct input signal of displacement of a given lever. Many components, which are
connected to machine ECM, can be calibrated using the MSD and ET. Perform the following steps to access
calibration procedures for machine ECM:
Machine must be supported and tracks OFF ground to perform this test (WP 0281).
1. Turn ignition switch to OFF position (TM 5-2410-240-10).
2. Connect MSD to machine (WP 0016).
3. Turn battery disconnect switch to ON position (TM 5-2410-240-10).
4. Turn ignition switch to ON position. Start ET and select machine control ECM.
N OT E
Wait at least 30 seconds for diagnostic codes to become active.
5. Monitor active diagnostic codes with ET.
6. Observe and record any active diagnostic codes. If diagnostic codes are set, refer to WP 0013.
0031-41


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.