• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 9. Harness and Retaining Hardware.
Figure 11. Harness and Filler Tube Retaining Hardware.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  428    429    430    431    432  433  434    435    436    437    438  
img
.
TM 5-2410-240-23-2
0088
INSTALLATION CONTINUED
N OT E
Route harness and install tiedown straps as noted during removal.
13. Position harness (Figure 10, Item 1) and install three new tiedown straps (Figure 10, Item 2).
Figure 10. Harness and Retaining Hardware.
0088
N OT E
Route harness and install tiedown straps as noted during removal.
14. Position harness (Figure 11, Item 1) and install three new tiedown straps (Figure 11, Item 2).
15. Install bracket (Figure 11, Item 6) and two bolts (Figure 11, Item 5) on plate (Figure 11, Item 8).
0088-12


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.