• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. Ether Injection Tube Hardware and Inlet Manifold Components.
Figure 7. Ether Injection Tube Hardware and Inlet Manifold Components.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  424    425    426    427    428  429  430    431    432    433    434  
img
.
TM 5-2410-240-23-2
0088
INSTALLATION
00088
1. Install two new dowel pins (Figure 6, Item 4) on inlet manifold (Figure 6, Item 1).
2. Install new gasket (Figure 6, Item 3) on inlet manifold (Figure 6, Item 1).
3. Install inlet manifold (Figure 6, Item 1) on engine.
WARN I N G
Use caution when using adhesives and sealants. Prolonged inhalation of vapors can
cause lung irritation. Contact with skin can cause dermatitis. Wear gloves and safety
goggles and use product in a well-ventilated area away from open flame. If ingested, keep
individual calm and seek medical attention. DO NOT induce vomiting. If contact with skin
or eyes is made, flush thoroughly with water. Dispose of cleanup rags IAW local policy and
ordinances. Failure to follow this warning may cause injury to personnel.
4. Apply sealing compound on 15 bolts (Figure 6, Item 2) and install 15 bolts on inlet manifold (Figure 6, Item 1).
Torque bolts in sequence shown (Figure 6) to 16 lb-ft (22 Nm).
Figure 6. Inlet Manifold Torque Sequence.
0088
0088-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.