• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Valve Cover Gasket.
AIR CLEANER SERVICE

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  544    545    546    547    548  549  550    551    552    553    554  
img
. .
TM 5-2410-240-23-2
0104
INSTALLATION CONTINUED
000104
N OT E
Ensure harness assemblies are not in contact with rocker arms or pinched by valve cover.
2. Install new O-ring (Figure 7, Item 8), breather (Figure 7, Item 3), and four screws (Figure 7, Item 2) on valve
cover (Figure 7, Item 1).
3. Install valve cover (Figure 7, Item 1) and 15 bolts (Figure 7, Item 6) on valve cover base (Figure 7, Item 7).
Tighten bolts in sequence shown (Figure 7) to 79 lb-in. (9 Nm).
4. Connect breather hose (Figure 7, Item 5) on breather (Figure 7, Item 3) and tighten clamp (Figure 7, Item 4).
Figure 7. Valve Mechanism Cover.
0104
END OF TASK
FOLLOW-ON TASKS
000104
1. If arctic kit heater equipped, install arctic kit heater (WP 0278).
2. Install fuel injection lines (WP 0060).
3. Verify correct operation of machine (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE
0104-7/(8 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.