TM 5-2410-240-23-2
0124
INSTALLATION CONTINUED
N OT E
Install adapter and fittings as noted during removal.
3. Install tee fitting (Figure 9, Item 3) on implement pump (Figure 9, Item 2) and tighten nut (Figure 9, Item 4).
4. Install adapter (Figure 9, Item 7) on tee fittings (Figure 9, Item 1).
5. Install adapter (Figure 9, Item 7) on implement pump (Figure 9, Item 2).
6. Install fitting (Figure 9, Item 6) on implement pump (Figure 9, Item 2).
7. Install coupler (Figure 9, Item 5) on implement pump (Figure 9, Item 2).
Figure 9. Fittings and Coupler on Implement Pump.
0124
0124-9