• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CHARGE PRESSURE HOSE REPLACEMENT (WITH RIPPER) - Continued
Figure 2. Hose Clamps.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1193    1194    1195    1196    1197  1198  1199    1200    1201    1202    1203  
img
.
TM 5-2410-240-23-2
0168
REMOVAL
000168
1. Remove tiedown strap (Figure 1, Item 6) from hose (Figure 1, Item 7). Discard tiedown strap.
2. Using hydraulic line remover tool kit, disconnect hose (Figure 1, Item 7) from filter base (Figure 1, Item 1).
3. Remove elbow (Figure 1, Item 3) from connector (Figure 1, Item 2).
4. Remove connector (Figure 1, Item 2) and two O-rings (Figure 1, Items 4 and 5) from filter base (Figure 1, Item
1). Discard O-rings.
Figure 1. Filter and Hose.
0168
0168-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.