• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Cover.
CHARGE PRESSURE HOSE REPLACEMENT (WITH RIPPER) - Continued

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1191    1192    1193    1194    1195  1196  1197    1198    1199    1200    1201  
img
. . . . .
12
TM 5-2410-240-23-2
0168
FIELD MAINTENANCE
-
CHARGE PRESSURE HOSE REPLACEMENT (WITH RIPPER)
0
168
Removal, Cleaning and Inspection, Installation
Effectivity Notice (with Ripper)
INITIAL SETUP
References
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
WP 0282
0
(WP 0289, Item 51)
0
Equipment Conditions
0
Gloves, Rubber (S0208) (WP 0289, Item 53)
0
Machine parked (TM 5-2410-240-10)
Goggles (S0209) (WP 0289, Item 53)
0
0
Bottom guards removed (WP 0156)
Tool Kit, Hydraulic Line Remover
0
Batteries removed (WP 0142)
(WP 0289, Item 50)
0
0
Front cab floor plate removed (WP 0205)
Wrench, Combination, 1-3/8" (S0791)
0
Hydraulic system pressure released
(WP 0289, Item 53)
0
(WP 0162)
Wrench, Combination, 1-7/16" (S0792)
0
Hydraulic system drained (WP 0160)
(WP 0289, Item 53)
0
0
Materials/Parts
Drawings Required
0
0
Cap set, protective (WP 0290, Item 4)
TM 5-2410-240-24P, Figure 76
0
0
Rag, wiping (WP 0290, Item 21)
0
Estimated Time to Complete
0
Tag, marker (WP 0290, Item 30)
0
1.0 Hr
0
Tiedown strap (WP 0290, Item 31)
0
O-ring (7)
0
0168-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.