Figure 8. Hose Clamps.
CHARGE PRESSURE HOSE REPLACEMENT (WITH WINCH)

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1201    1202    1203    1204    1205  1206  1207    1208    1209    1210    1211  
img
. . . .
TM 5-2410-240-23-2
0168
INSTALLATION CONTINUED
N OT E
Install hoses, fittings, and tiedown straps as noted during removal.
9. Install new O-ring (Figure 9, Item 4) and connector (Figure 9, Item 2) on filter base (Figure 9, Item 1).
10. Install new O-ring (Figure 9, Item 5) and elbow (Figure 9, Item 3) on connector (Figure 9, Item 2).
11. Connect hose (Figure 9, Item 7) to filter base (Figure 9, Item 1) and install tiedown strap (Figure 9, Item 6) on
hose (Figure 9, Item 7).
Figure 9. Filter and Hose.
0168
END OF TASK
FOLLOW-ON TASKS
000168
1. Install front cab floor plate (WP 0205).
2. Install batteries (WP 0142).
3. Fill hydraulic system (WP 0160).
4. Install bottom guards (WP 0156).
5. Verify correct operation of machine (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE
0168-11/(12 blank)