Figure 16. Pump Hoses.
Figure 18. Tank to Valve Bank Hose.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1236    1237    1238    1239    1240  1241  1242    1243    1244    1245    1246  
img
.
TM 5-2410-240-23-2
0170
HOSES INSTALLATION CONTINUED
14. Install two new O-rings (Figure 17, Items 5 and 8) and two connectors (Figure 17, Items 4 and 7) on valve bank
(Figure 17, Item 9).
15. Install two new O-rings (Figure 17, Items 3 and 6) on two connectors (Figure 17, Items 4 and 7), and connect
two hoses (Figure 17, Items 1 and 2) to valve bank (Figure 17, Item 9).
Figure 17. Valve Bank Hoses.
0170
0170-19