12
TM 5-2410-240-23-2
FIELD MAINTENANCE
-
LIFT CYLINDER TUBE REPLACEMENT
0
172
Bulkhead Bracket Removal, Right Side Lift Tubes Removal, Left Side Lift Tubes Removal,
Cleaning and Inspection, Left Side Lift Tubes Installation, Right Side Lift Tubes Installation,
Bulkhead Bracket Installation
INITIAL SETUP
References
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
WP 0282
0
(WP 0289, Item 51)
0
Equipment Conditions
0
Gloves, Rubber (S0208)
Machine parked (TM 5-2410-240-10)
(WP 0289, Item 53)
0
0
Goggles (S0209) (WP 0289, Item 53)
0
0
Hydraulic system pressure released
Pan, Drain (S0255) (WP 0289, Item 53)
0
Wrench, Combination, 1-1/8" (S0788)
0
Debris guards removed
(WP 0289, Item 53)
0
(WP 0187)
Wrench, Combination, 1-1/8" (S0791)
0
Front cab floor plate removed (WP 0205)
(WP 0289, Item 53)
0
0
Wrench, Combination, 1-5/8" (S0794)
0
(WP 0289, Item 53)
0
Drawings Required
0
Materials/Parts
TM 5-2410-240-24P, Figure 76
0
0
Cap set, protective (WP 0290, Item 4)
0
Estimated Time to Complete
0
Rag, wiping (WP 0290, Item 21)
0
1.5 Hr
0
Tag, marker (WP 0290, Item 30)
0
Tiedown strap (WP 0290, Item 31)
0
O-ring (9)
0
0172-1