• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 10. Pump to Valve Bank Hoses.
Figure 12. Hydraulic Tank to Pump Hose.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1251    1252    1253    1254    1255  1256  1257    1258    1259    1260    1261  
img
.
TM 5-2410-240-23-2
0171
HOSES INSTALLATION CONTINUED
10. Install connector (Figure 11, Item 2) and new O-ring (Figure 11, Item 3) on valve bank (Figure 11, Item 4).
N OT E
Install hoses as noted during removal procedure.
11. Install new O-ring (Figure 11, Item 3) and hose (Figure 11, Item 5) on connector (Figure 11, Item 2).
12. Install new O-ring (Figure 11, Item 7) and check valve (Figure 11, Item 6) on hydraulic tank (Figure 11, Item 1).
13. Install new O-ring (Figure 11, Item 7) and connect hose (Figure 11, Item 5) to check valve (Figure 11, Item 6).
Figure 11. Tank to Valve Bank Hose.
0171
0171-13


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.