TM 5-2410-240-23-2
0173
REMOVAL CONTINUED
N OT E
Tag all hoses and fittings to aid installation.
Use a container to catch any fluid that may drain from hoses or system. Dispose of fluid
IAW local policy and ordinances. Ensure all spills are cleaned up.
Note routing of hoses and lines to aid installation.
7. Loosen three hose fittings (Figure 3, Item 1) and remove three O-rings (Figure 3, Item 4) from demand fan
manifold (Figure 3, Item 5). Discard O-rings.
8. Remove three connectors (Figure 3, Item 3) and O-rings (Figure 3, Item 2) from demand fan manifold
(Figure 3, Item 5). Discard O-rings.
Figure 3. Demand Fan Hoses.
0173