• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Hose and Elbow Assembly.
Figure 5. Hose Clamp.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1268    1269    1270    1271    1272  1273  1274    1275    1276    1277    1278  
img
.
TM 5-2410-240-23-2
0173
REMOVAL CONTINUED
N OT E
Tag all hoses and fittings to aid installation.
Use a container to catch any fluid that may drain from hoses or system. Dispose of fluid
IAW local policy and ordinances. Ensure all spills are cleaned up.
Note routing of hoses and lines to aid installation.
7. Loosen three hose fittings (Figure 3, Item 1) and remove three O-rings (Figure 3, Item 4) from demand fan
manifold (Figure 3, Item 5). Discard O-rings.
8. Remove three connectors (Figure 3, Item 3) and O-rings (Figure 3, Item 2) from demand fan manifold
(Figure 3, Item 5). Discard O-rings.
Figure 3. Demand Fan Hoses.
0173
0173-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.