• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 16. Valve Solenoid Cover.
Figure 19. Valve Solenoid Cover.

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  199    200    201    202    203  204  205    206    207    208    209  
img
.
TM 5-2410-240-23-3
0196
DISASSEMBLY CONTINUED
C AU T I O N
Mark each valve to identify its location to aid installation. Valves installed in the incorrect
order may cause damage to equipment.
23. Remove blade lift control valve (Figure 18, Item 5) from bolts (Figure 18, Item 4).
N OT E
Note location and size of O-rings to aid installation.
24. Remove two fittings (Figure 18, Item 1) and four O-rings (Figure 18, Item 2) from blade lift control valve
(Figure 18, Item 5). Discard O-rings.
N OT E
During removal, O-rings may stick to either side of valve face.
Note location and size of O-rings to aid installation.
25. Remove six O-rings (Figure 18, Item 3) from blade lift control valve (Figure 18, Item 5). Discard O-rings.
Figure 18. Blade Lift Control Valve.
0196
0196-14


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.